our experienceS

Projects

Ongoing Projects

  1. Provision of Consultancy Services for Asset Life Study (ALS) for PETRONAS Carigali Sdn Bhd, Peninsular Malaysia Asset (PCSB-PMA). Provide One (1) Principal Consultant for Mechanical Rotating for the study.

  2. Digitalization for Reliability, Availability & Integrity (RAI) for EISmartwork for Nippon JX:
    • Twin Mapping – Construct, review and mapping client’s RCM deliverables and Maximo’s Work Order, against the APM’s
    • Provide a team of reliability, turbomachinery, rotating and CMMS engineers/ executive for the project.

  3. Provision of One (1) Principal Consultant for Mechanical Rotating Equipment for Carigali Hess Operating Company (CHOC) for Late Field Life Optimization (LFLO).
    • The review will focus exclusively on the technical and operational integrity aspect. Planned upgrades or replacements, including considerations of obsolescence and mean time between failures, will also be incorporated into the review. Focus on pumps.
    • Visited Cakarewala Complex, wellhead platforms and FSO. Total 6 platforms and 1 FSO.

  4. Provision of Safety-Critical Equipment & Performance Standard (SCE & PS) Analysis for Jadestone Energy (part of a 3+1-year contract):
    • PM323: Consists of East Belumut (BEL), Chermingat (CHRA) and West Belumut (WBA).
    • PM329: Consists of East Piatu CPP (EPCPP) and East Piatu WHP (EPWHP).

  5. Software As A Service (SaaS) in utilizing the WindChill Risk & Reliability software on behalf of ST Land of Singapore in supporting the FMEA, FTA and Maintainability Prediction Modules. The support include training, software customization, usability and coaching.

  6. Technical expertise with total reliability solution mainly to improve Vale Malaysia Minerals (VMM) Sdn Bhd reliability in overall process and current asset management strategies. The studies consist of: 
    • Maintenance Strategy Review and development via ECA and RCM.
    • Reliability Analysis via FMEA, Weibull Analysis, RAM. 
    • Data analysis on Condition Monitoring input
    • Reliability Improvement on identified critical equipment/ component. 
    • Life Cycle Cost Analysis
    • Reliability Auditing

  7. Provision of Technical & Maintenance Consultancy Services for Integrated Asset Management System (IAMS):
    1. IAMS Documents Review & Update:
      • Performed Comparative Assessment for KPOC IAMS against ISO55001, OSR-MS, PETRONAS Governing Standard and other shareholders’ procedures i.e. Shell & COP.
      • Provide top level Policy and Tier 1 document for IAMS Manual/ Guideline.
      • Coordinate, produced, aligned and updating KPOC Tier 2 & 3 documents in supporting the Asset Integrity Management System (AIMS).
      • Focal person with the client for the WBS. Peer review consultant deliverables.
    2. Spare Part Analysis and BOM Redevelopment for KPOC’s Integrated Asset Management System (IAMS) on behalf of BV, which include:
      • Review, Update and Develop Procedures and Guidelines.
      • Spare Inventory Development:
        • Spares Bill of Material.
        • Material Enhancement.
        • Spare Part Inventory (Min/ Max/ ROP).
        • Spare Part Cataloguing.
      • SAP Uploading. 

Completed Projects

  1. Software supply for One Rail Solutions (Malaysia):
    • Supply, install, testing and commissioning of Relyence software, which consist of Reliability Block Diagram (RBD) Module, for one (1) concurrent user.
    • Training on Software utilization

  2. Relyence Software supply for PT Wide & Pin (Indonesia):
    • Supply, install, testing and commissioning of Relyence software, which consist of Reliability Block Diagram (RBD) Weibull & RCM Module, for one (1) concurrent user.
    • Training on Software utilization.

  3. Provision of Manpower Supply, Principal Consultant on Mechanical Rotating for MUBADALA IOAIA Audit.

  4. Provision of Manpower Supply, Principal Consultant on Mechanical Rotating for EMEPMI, Tapis-A&R, IB-A, SM-A, IOAIA Audit.

  5. Software supply for PT Aneka Pantera Integritas (Indonesia):
    • Supply, install, testing and commissioning of Relyence software, which consist of Reliability Block Diagram (RBD) Module, for one (1) concurrent user.
    • Training on Software utilization.

  6. Training on ISO14224; Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment for Cekap Technical Sdn Bhd for 14 pax. The training includes theoretical and practical, covering topics such as:
    •  ISO14224ISO14224
    • P&ID and Asset Register – Hierarchy and Level
    • ECA & RCM, which include FMEA/ FMECA
    • Reliability Performance Monitoring
    • Data Analysis

  7. Provision of Facilitators for Royal Malaysia Air Force (RMAF) Materiel Unit, For Logistic System Analysis (LSA) and Life Cycle Cost (LCC) as part of ILMS Program.

  8. Supply, installation, testing, commissioning and training for the 2nd largest Power Generation Company in Indonesia for Relyence Modules:
    • Reliability Block Diagram (RBD)
    • Weibull/ Life Data Analysis

  9. Utilized FMEA for rotating equipment such as Diesel Engine Generator (DEG), Instrument Air Compressor, Fire Water Pump, Mixer, and Sanitary Pumps for a Fertilizer Company.

  10. Supply, install, testing, commissioning & training for Aerospace & Defence (A&D) Malaysia company, for Relyence Module:
    • FMEA
    • Reliability Prediction
    • Reliability Block Diagram (RBD)
    • Fault Tree Analysis (FTA)
    • Maintenance Support

  11. Digitalization and roadmap for Reliability, Availability & Integrity (RAI) KPIs Tracking and Monitoring for an O&G client.

  12. Digitalization for Bad Actor Management (BAM) and Root Cause Failure Analysis (RCFA) for an O&G client.

  13. Feasible Study via RAM Modelling & Simulations with MAROS for an O&G client.

  14. ALE Study Rotating Equipment for an O&G client.

  15. Performed Reliability Improvement project for an O&G client, which consist of:
    • Master Asset Register
    • Conducted Equipment Criticality Assessment (ECA)
    • Carried out Performance Standard
    • Performed SECE
    • Conducted Reliability Centered Maintenance (RCM) Analysis Study
    • Output into CMMMS software, IBM MAXIMO Ver 7.5

  16. Carried out Performance analysis and studies for pump house and water gate for Department of Irrigation & Drainage (DID), Malaysia,
    • Life Cycle Cost studyCarried out FMEA and RCM
    • Analysis in optimizing maintenance strategy using Relyence software for DID, Malaysia.

  17. Conduct Gap Analysis for FMECA based on ISO 14224 Workshop for the biggest Power Generation Company, Indonesia.

  18. RAM Modeling with MAROS for an O&G client, which also include FMEA & LCC study

  19. Conducted FMEA /ERS Workshop and developed 15 FMEAs for rotating equipment for a Refinery Company

  20. Developed Spare Part Methodology & Technique, with sampling analysis for all discipline for a Petrochemical Complex

  21. Conducted RAM Workshop for a Consultant Firm client

Need Help With Safety, Performance And Reliability, With Cost Effective And Pragmatic Solution? We Are The Experts!

Scroll to Top