NASIR BIN HASNAIN,
CEng FIMechE

Nasir bin Hasnan, CEng FIMechE

Consultant, Reliability & Asset Management System (AMS)

ACADEMIC QUALIFICATION

Heriot-Watt University, Edinburgh Scotland
1988 Bachelor of Engineering (Hons) Mechanical Engineering

 

PROFESSIONAL MEMBERSHIP

  • Chartered Engineer (Fellowship) with IMechE(UK)

ACHIEVEMENTS

  1. Presented papers at various technical conference
  • “Challenges to Improve Turbomachinery Availability” at Society of Petroleum Engineer Conference in Perth. 2002
  • “Improve Jerneh Condensate Transfer Pump packing life” at Esso Asia Pacific Machinery Workshop. 1997
  • “Equipment Strategies, a Proactive Defect Elimination” IPQC Defect Elimination conference. 2005

INDUSTRIAL EXPERIENCES

  • 30 Years in Oil & Gas Industries
  • Mechanical Engineer (Woodard Textile Sdn Bhd)
  • Commissioning Engineer (Antah Biwater JV)
  • Machinery and Reliability Engineer (ExxonMobil). 
  • Reliability Engineer (Petronas Gas Berhad)
  • Rotating Equipment Engineering Specialist (RasGas, Qatar)
  • Gas Turbine Specialist (Saudi Aramco, Saudi Arabia)
  • Consultant (NashCo Consulting)
  • “Opportunity Risk Assessment for KCS” Performance Enhancement Conference 2005
  • “KCS Reliability Improvement Journey” RR Asia Pacific Technical Conference. July 17, 2006
  • “Equipment Strategies for PGB” RITEM 2006
  • Presented a two-hour talk on industrial Gas Turbine at Cranfield University 2014 Gas Turbine Week.
  1. Mentor to new ExxonMobil/PCSB and Aramco engineers
  2. Conducted in-house trainings
  • Gas Turbine Operation and Maintenance for Saudi Aramco engineers
  • Risk base equipment strategies. (Structured approach RCM)
  • Equipment Criticality Assessment
  • Rolls Royce RB211 Operation and Maintenance
  • Gas Turbine Level 3
  • Combine RB211 and Solar Mars Operation and Maintenance  
  • Gas Turbine Fundamentals
  1. Organized and facilitated Turbomachinery Workshops
  2. Increase positive displacement pump packing life (two weeks to one year) of ExxonMobil Jerneh-A condensate transfer pump.
  3. Team leader to restore HP compressors after collapse strainer and LGR compressors due to O ring failure

Our Other Trainers

Need help with Safety, Performance and Reliability Pain, with Cost Effective and Pragmatic Solution? We Are The Experts!

Scroll to Top